samsun ekipman1

Toros Samsun Harbour
Operations are carried out with 2 cranes in total, one mobile, at 2 piers in Toros Samsun Terminal.

  • Pier-1: 1 crane of 30 tons lifting and 1000 tons/ hour unload/ load capacity, that can move along the rail over the pier platform.
  • Pier-2: 250 tons /hour unload capacity 1 mobile crane.