Toros Ceyhan Harbour
At Toros Ceyhan Port, with 8 cranes in total at 8 separate ship-docking piers, different bulk cargo groups’ handling operations are carried out.
- Pier-1: 6 tons lifting and 125 tons/ hour unload/ load capacity, 1 crane that can move along the rail over the pier platform; 8 ton lifting and 175 tons/ hour unload/ load capacity, 1 crane that can more along the rail over the pier platform.
- Pier-4: 2 cranes of 17 tons lifting and each one 400-tons/-hour unload/ load capacity that can move along the rail over the pier platform.
- Pier-5: 2 cranes of 30 tons lifting and each one 600-tons/-hour unload/ load capacity that can move along the rail over the pier platform.
- Pier-7: 2 cranes of 20 tons lifting and each one 580-tons/-hour unload/ load capacity that can move along the rail over the pier platform.